DESIGN OF “KENSEMAX BUSINESS CENTER” MULTI-STORY COMMERCIAL BUILDING IN SAN-FRANCISCO, USA

dc.contributor.authorYessengeldin, Ali
dc.contributor.authorZhunisbek, Amirzhan
dc.contributor.authorBauyrzhanov, Arulan
dc.contributor.authorZhumabek, Baryskhan
dc.contributor.authorKakabay, Bernar
dc.contributor.authorMukhamedkhan, Kuanysh
dc.contributor.authorMaulembayev, Serikbolsyn
dc.date.accessioned2024-06-18T06:20:06Z
dc.date.available2024-06-18T06:20:06Z
dc.date.issued2024-04-20
dc.description.abstractThe main objective of this project is to design a multi-story commercial building located in San Francisco, California, USA. The address of the construction site is located at 2555 Irving St., Sunset District of San Francisco city. This project aims at increasing the commercial activity in the neighborhood by providing office spaces for companies of various sizes. The design is done by implementing previously obtained knowledge from courses in different disciplines of civil engineering, including architectural, structural, geotechnical, environmental design, and construction management. The design of the structure and foundations was done according to the local building codes, mainly ASCE-7 by American Society of Civil Engineers and International Building Code (IBC). The design process involved performing hand calculations the results of which were then compared with the simulation results of software such as SAP2000, GEO5, and PLAXIS 3D. The architectural and structural parts of the project focus on designing a structure that will be able to withstand the conditions from the surrounding environment, including seismic activity, corrosion, dead, live, and wind loads. The geotechnical part involves designing a proper foundation that will act as a support for transferring the structural loads from the building to the soil. Environmental design focuses on developing a strategy that will help to efficiently manage the waste produced by the daily activities of customers that rent the office spaces of the building. The purpose of construction management is to create a strategy for a more efficient allocation of resources, organizing the construction process into smaller tasks, reviewing various risks that may occur during the construction project.en_US
dc.identifier.citationYessengeldin, Ali; Zhunisbek, Amirzhan; Bauyrzhanov, Arulan; Zhumabek, Baryskhan; Kakabay, Bernar; Mukhamedkhan, Kuanysh; Maulembayev, Serikbolsyn. (2024). Design Of “Kensemax Business Center” Multi-Story Commercial Building In San-Francisco, USA. Nazarbayev University School of Engineering and Digital Sciencesen_US
dc.identifier.urihttp://nur.nu.edu.kz/handle/123456789/7875
dc.language.isoenen_US
dc.publisherNazarbayev University School of Engineering and Digital Sciencesen_US
dc.rightsAttribution 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/us/*
dc.subjectType of access: Open accessen_US
dc.subjectResearch Subject Categories::TECHNOLOGY::Civil engineering and architectureen_US
dc.titleDESIGN OF “KENSEMAX BUSINESS CENTER” MULTI-STORY COMMERCIAL BUILDING IN SAN-FRANCISCO, USAen_US
dc.typeBachelor's thesisen_US
workflow.import.sourcescience

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
BEng_CEE_Capstone_Project_Group2.pdf
Size:
4.68 MB
Format:
Adobe Portable Document Format
Description:
capstone project
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
6.28 KB
Format:
Item-specific license agreed upon to submission
Description: