Abstract:
Three-dimensional CFD-DEM-IBM simulations of sand production in a sandstone formation, using periodic
boundaries, were performed using 10000 frictional elastic spheres bonded together and compressed at 1 MPa of
overburden pressure. Sand production simulation geometry and procedures are proposed, in which the cone
penetration test (CPT) has been used to investigate the physical perforation penetration of the cemented sandstone material with the real-world grain size distribution from the Ustyurt-Buzachi Sedimentary Basin. The
Immersed Boundary Method (IBM) was adapted for the sand production simulation geometry to simulate the
fluid flow near the well casing. Oil with low viscosity and density was used as an injection fluid (reservoir fluid).
This study shows what happens in the first 0.1 s immediately after perforating of the cased horizontal oil well.
Erosion near the perforation tunnel was triggered due to the pressure drawdown, where the production of sand
particles was initiated during the first flow due to the drag force that lifted the sand particles from the perforation
damage zone. At the beginning of the simulation a sand arch was captured around the perforation tunnel and due
to the fluid flow it collapsed and the perforation cavity became larger. The amount and mass of produced sand
particles were calculated. The research findings provide insight into the sanding process and could be helpful for
practicing engineers to understand the sanding mechanism at micro and macro scales. The results show that the
proposed model is promising, and the innovative CFD-DEM-IBM-based system should be further elaborated to
simulate the sand production in a sandstone formation.