Construction of steel plate I-girder bridge in Jeonju, South Korea

dc.contributor.authorKarymsakov, Nariman
dc.contributor.authorYesbergen, Baizhan
dc.contributor.authorAmangeldy, Kanat
dc.contributor.authorSadyrbayeva, Akbota
dc.contributor.authorKenzheshova, Akgul
dc.date.accessioned2018-05-10T03:59:23Z
dc.date.available2018-05-10T03:59:23Z
dc.date.issued2018-04-16
dc.description.abstractDesigning a bridge is one of the complex engineering problems. In order to design a bridge, an engineer firstly needs to choose the type of bridge he is going to construct, and in the process of a design determine the most significant factors in the analysis and selection, and to develop a comprehensive understanding in designing a bridge. In this paper, our group has mainly focused on the structural part of the bridge such as analysis of the loads, and behavior of the bridge under stresses. It is also essential to understand material characteristics and behavior under the loads in order to maintain stability and duration. The specifications of the design criteria are met according to the AASHTO code.en_US
dc.identifier.urihttp://nur.nu.edu.kz/handle/123456789/3177
dc.language.isoenen_US
dc.publisherNazarbayev University School of Engineering and Digital Sciences
dc.rightsCC0 1.0 Universal*
dc.rights.urihttp://creativecommons.org/publicdomain/zero/1.0/*
dc.titleConstruction of steel plate I-girder bridge in Jeonju, South Koreaen_US
dc.typeCapstone Projecten_US
workflow.import.sourcescience

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Capstone_Final_Report_Group5 (1).pdf
Size:
4.74 MB
Format:
Adobe Portable Document Format
Description: