DETERMINING AIRFLOW REQUIREMENTS FOR DILUTION MINE DUST AND DPM IN UNDERGROUND MINE DRILLING HORIZON

dc.contributor.authorJumabekova, Merey
dc.date.accessioned2025-06-19T12:26:10Z
dc.date.available2025-06-19T12:26:10Z
dc.date.issued2025-05-12
dc.description.abstractThe mining sector poses enormous health risks owing to diesel-powered machinery and blasting due to Diesel Particulate Matter (DPM) and mine dust. These pollutants are associated with respiratory conditions such as silicosis and pneumoconiosis. In this thesis, I work on the problem of optimizing airflow to lower DPM and dust levels in underground mines, specifically at the drilling horizon. An underground mine was modelled using VentSim Design 5.4 software to create a simulation model of an underground mine for the purposes of comparing original and optimized ventilation strategies. The results show that increasing the air supply diminishes DPM and dust levels in the most affected areas. Nonetheless, excessive airflow velocities are likely to generate conditions for dust resuspension, emphasizing the balance of ventilation necessity. The results support the need to improve miners' health and safety, optimizing ventilation systems to limit particulate exposure.
dc.identifier.citationJumabekova, M. (2025).Determining airflow requirements for dilution mine dust and DPM in underground mine drilling horizon. Nazarbayev University School of Mining and Geosciences
dc.identifier.urihttps://nur.nu.edu.kz/handle/123456789/9024
dc.language.isoen
dc.publisherNazarbayev University School of Mining and Geosciences
dc.rightsCC0 1.0 Universalen
dc.rights.urihttp://creativecommons.org/publicdomain/zero/1.0/
dc.subjectUndeground Mining
dc.subjectVentilation
dc.subjectDiesel Particulate Matter (DPM)
dc.subjectAirflow Optimization
dc.subjectMining Engineering
dc.subjectTECHNOLOGY::Civil engineering and architecture::Geoengineering and mining engineering
dc.subjectParticulate Matter (PM)
dc.subjectMining Machinery Emissions
dc.subjecttype of access: open access
dc.titleDETERMINING AIRFLOW REQUIREMENTS FOR DILUTION MINE DUST AND DPM IN UNDERGROUND MINE DRILLING HORIZON
dc.typeBachelor's thesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Determining airflow requirements for dilution mine dust and DPM in underground mine drilling horizon
Size:
1.88 MB
Format:
Adobe Portable Document Format
Description:
Bachelor's thesis