DSpace Repository

RELIABILITY ANALYSIS OF OPEN PIT SLOPE: CASE STUDY OF BOZSHAKOL MINE

Система будет остановлена для регулярного обслуживания. Пожалуйста, сохраните рабочие данные и выйдите из системы.

Show simple item record

dc.contributor.author Anyasodor, Hayes
dc.date.accessioned 2023-08-09T10:25:45Z
dc.date.available 2023-08-09T10:25:45Z
dc.date.issued 2023
dc.identifier.citation Anyasodor, K. H. (2023). Reliability analysis of open pit slope: case study of Bozshakol mine. School of Mining and Geosciences en_US
dc.identifier.uri http://nur.nu.edu.kz/handle/123456789/7370
dc.description.abstract The increase in the probability of failures in pit slope design are influenced by the presence of the inherent variability of rock mass properties. This could result in uncertainties during geotechnical design. Although, utilizing conservative approach such as overdesigning to account for the worst-case scenario, can effectively address these issues in practice. Despite this, one of the approach’s shortcomings is that it is quite expensive. In order to tackle these difficulties, it is crucial to devise a probabilistic technique that allows for thorough consideration of these uncertainties associated with geotechnical parameters when designing mine pit. With this in mind, the objective of this study is to execute the reliability analysis of the Bozshakol mine pit slope design. This method would involve utilising advanced numerical models, such as Slide 2 and RS 2 to design selected pit sectors by determining their factor of safety and probability of failure based on the input variables obtained from the case study area. The first-order reliability method was used to analyse the results obtained from the model. Furthermore, the expected outcomes provide a means of addressing these uncertainties and establishing a specific target for the probability of failure in pit slope design. Subsequently, an evaluation was conducted to estimate the reliability indices of geotechnical domains pertaining to the pit sectors. This was accomplished in order to determine the reliability of the pit design and to identify probable risks of unforeseen pit failures that could be addressed in a timely manner. en_US
dc.language.iso en en_US
dc.publisher School of Mining and Geosciences en_US
dc.rights Attribution-NonCommercial-ShareAlike 3.0 United States *
dc.rights.uri http://creativecommons.org/licenses/by-nc-sa/3.0/us/ *
dc.subject Type of access: Embargo en_US
dc.subject reliability analysis en_US
dc.subject pit slope design en_US
dc.subject numerical modelling en_US
dc.title RELIABILITY ANALYSIS OF OPEN PIT SLOPE: CASE STUDY OF BOZSHAKOL MINE en_US
dc.type Master's thesis en_US
workflow.import.source science


Files in this item

The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-ShareAlike 3.0 United States Except where otherwise noted, this item's license is described as Attribution-NonCommercial-ShareAlike 3.0 United States